воскресенье, 13 сентября 2020 г.

9M79 Tochka launch from Belorussia VoenTV

9M79 Tochka launch from Belorussia VoenTV

09.09.2020 belorussian army's TV "VoenTV" published video with launch of 9M79 missile "Tochka" SS-21 SCARAB (not "Tochka-U"). In this video was used mod. 9M79F with warhead 9N123F. Interesting that CEP of missile was near 36 meters and radius of total damage of warhead was near 42 meters. Also very interesting that old missile 9M79 can fly.

TEL 9P129M Tochka with missile 9M79

Launch of belorussian 9M79 Tochka

    




Yours Missiles Underground

понедельник, 7 сентября 2020 г.

First ejection test of Sarmat ICBM

First ejection test of Sarmat ICBM

update - as wrote MilitaryRussia.Ru this is not Sarmat - this is UR-100UTTkH - you can see note about this at MilitaryRussia

In december of 2017 at Plesetsk missiles test center was first ejection test of Sarmat large liquide ICBM. Designarion of this ICBM in Russia is "128 complex" or missile 15A28. Main developer is Makeev State Rocket Center (at Miass, Ural).

Russian ecologists have completed a full cycle of work on reclamation and restoration of nature in the place where the first Sarmat ICBM down.

Stage of Sarmat ICBM, december 2017 (ecologists site)

Mi-8 of ecoligists group at the place of Sarmat ICBM test, december 2017 (ecologists site)





воскресенье, 6 сентября 2020 г.

Google Maps vs Sarmat ICBM

Google Maps vs Sarmat ICBM

Time and power. Power and time. And Google Maps can place in shadow russian Sarmat ICBM testing place at Plesetsk missiles test center. Let's see this. May be not special of course but I think "by order" from russian special services.

ICBM RS-28 Sarmat test site - ESRI Maxar Maps (2019-2020)

ICBM RS-28 Sarmat test site - ESRI Maxar Maps (2019-2020)

ICBM RS-28 Sarmat test site - Bing Maps (2018-2019 may be)

ICBM RS-28 Sarmat test site - Google Maps (2014 !!!) - and thats all...

Yours Missiles Underground



And about Sarmat (part II)

Engines According to the already known data on the Sarmat rocket, the development of engines for the first stage is carried out by NPO Energ...